Our client, a pharmaceutical wholesaler, required a new warehouse and head office.

A main warehouse was constructed to be used primarily for trade sales. It is separated into a general warehouse area, bulk storage area and loading dock area. A mezzanine level was also incorporated into the design and is utilised for additional material storage.

The second part of the facility comprises the offices, with a sweeping staircase leading into the main office area. The fit-out was completed with high level finishes and the external areas surrounding the building contain loading bays, parking and landscaping.

 
all-tilt-up-constructions-project-seven-hills.jpg
all-tilt-up-constructions-seven-hills-completed-projects.jpg
all-tilt-up-constructions-seven-hills-projects-completed.jpg
all-tilt-up-sydney-seven-hills-projects.jpg